CIVIL& ELECTRICAL |
||
N0: |
Details of Project |
Client/ consultant |
1 |
220kv & 66kv Transmission Development(2007-2011) EPC Project Al Sakhir Substation Project - Equipments, Panels, Civil works, Cable supply & installation |
EWA/ ESBI |
| 2 | BAPCO 66kv substation civil works with associate engineering & administrative authorisation |
AREVA T&D/ ESBI |
| 3 | Construction of 11kv intake substation building & switch room at Zallaq |
EWA/ESBI |
| 4 | Electrical installtion for Scada works for SADP project |
BAPCO |
| 5 | Replacement of 220 kv oil filled cable under Sitra bridge |
ETD/EWA |
| 6 | Replacement & modernisation of airfield lighting at Bahrain International Airport |
Civil Aviation Directorate |
| 7 | Security lighting, Power distribution, Construction of Substation & switch rooam at Safra |
Public Security |
| 8 | Street lighting at Awali Residential and Office Complex |
BAPCO |
| 9 | Upgrading Power Installations at Riffa |
BDF |
| 10 | Installation of 220kv Cable feeders-phase 1 |
MEW |
| 11 | Electrical works for wharf & Al Daar Valve stations |
BANCO |
| 12 | 66 kv transmission development 95-97 |
EDD |
| 13 | ED-ALBA 66kv link |
ALBA |
ELECTRICAL |
||
| 1 | 220 kv & 66kv Transmission Development(2000-2004), 2005-2009) & (2007-2011) –ALL THREE PHASES-Cable Feeders Civil Works & Installation |
EWA/ESBI |
| 2 | 66kv cable works, civil works & installation at BAPCO Refinery |
AREVA T&D/ ESBI |
| 3 | Construction of 11kv intake substation building & switch room at Zallaq |
EWA/ESBI |
| 4 | Electrical installtion for Scada works for SADP project |
BAPCO |
| 5 | Replacement of 220 kv oil filled cable under Sitra bridge |
ETD/EWA |
| 6 | Replacement & modernisation of airfield lighting at Bahrain International Airport |
Civil Aviation Directorate |
| 7 | Security lighting, Power distribution, Construction of Substation & switch rooam at Safra |
Public Security |
| 8 | Street lighting at Awali Residential and Office Complex |
BAPCO |
| 9 | Upgrading Power Installations at Riffa |
BDF |
| 10 | Installation of 220kv Cable feeders-phase 1 |
MEW |
| 11 | Electrical works for wharf & Al Daar Valve stations |
BANCO |
| 12 | 66 kv transmission development 95-97 |
EDD |
| 13 | ED-ALBA 66kv link |
ALBA |
WATER LINE |
||
| 1 | Laying 200mm dia DI water pipeline from Al Jazer Beach, Al Areen Rd to Al Muttalah Area |
BANOCO |
| 2 | Emergency repair to water mains & laying of 600 mm dia DI pipes |
MEW |
| 3 | Laying 200mm dia DI water pipeline at Rumaitha |
MOHME |
| 4 | Transmission Pipelines in Northern Region (800ØJanusan DS to Budaya DS & 600Ø to Sar DS) |
EWA/BLACK & Vetch |
| 5 | DI Mains of 300/400mm dia for Formula 1, Sakhir |
MEW |
| 6 | 800/600mm ØDI pipeline from Alba Forwarding station to Sitra Blending |
EWA/Hyder Consulting |
| 7 | North Manama Causeway diversion pipeline |
MEW |
| AL KOOHEJI ELECTRICAL CONTRACTORS & CONSTRUCTION W.L.L | ||||||
| DETAILS OF PROJECTS UNDERTAKEN | ||||||
| Sl.No | contract No. | Project Name | Client | Equipment/ Manufacturer/ consultant | Details of work | |
| CONSTRUCTION OF 66kV SUBSTATIONS | ||||||
| 1 | CONSTRUCTION OF 66kV SUB STATION, SAKIR AIR BASE | EWA | SUMITOMO | Civil & MEP Works for substations | ||
| 2 | CONSTRUCTION OF 66kV SUB STATION, ISA AIR BASE | EWA | SUMITOMO | Civil & MEP Works for substations | ||
| 3 | CONSTRUCTION OF 66kV SUB STATION, BDF MEDICAL CENTRE | EWA | General Electricals | Civil & MEP Works for substations | ||
| 4 | CONSTRUCTION OF 66kV SUB STATION, HAMALA BDF | EWA | SUMITOMO | Civil & MEP Works for substations | ||
| INSTALLATION OF 66kV CABLES | ||||||
| 5 | 305/2004/3100 | Installation of 66kV Cable from Zallaq Highway to Sakir AirBase | EWA | Saudi Cable | Double Circuit - kms; | |
| 305/2004/3100 | EWA | Saudi Cable | Single Circuit - kms | |||
| 6 | 305/2004/3100 | Installation of 66kV Cable from Addur to Isa AirBase | EWA | Saudi Cable | Double Circuit - kms; | |
| 305/2004/3100 | EWA | Saudi Cable | Single Circuit - 8.865 kms | |||
| 7 | 305/2004/3100 | Installation of 66kV Cable from Wadi Ali to BDF Medical Centre | EWA | Saudi Cable | Double Circuit - kms | |
| 305/2004/3100 | EWA | Saudi Cable | Single Circuit - kms | |||
| 8 | 305/2004/3100 | 66kV Wadi Ali Sail - BDF Hospital (Diversion of Wadi Ali Sail - Riffa 1+2& 3) | EWA | ESBI | ||
| 9 | 305/2004/3100 | 66kV Sharq Marsa Al Bahrain - Bharain Logistics 1+2 & 3 | EWA | ESBI | ||
| 10 | 305/2004/3100 | 66kV Hidd Industrial Area - Bahrain LNG 1+2 & 3 | EWA | ESBI | ||
| 11 | 305/2004/3100 | 66kV BLNG - Mina Khalifa 1+2 & 3 | EWA | ESBI | ||
| 12 | 305/2004/3100 | 66kV Diversion, Hidd Industrial Area - Mina Kalifa 1+2 & 3 | EWA | ESBI | ||
| 13 | 305/2004/3100 | 66kV Transmission Development(2007-2011) EPC Project Al Sakhir Substation Project - Equipments, Panels, Civil works, Cable supply & MEP installation | EWA | ESBI | ||
| 14 | 305/2004/3100 | 66kV Transmission Development(2000-2004), 2005-2009) & (2007-2011) –ALL THREE PHASES-Cable Feeders Civil Works & Installation | EWA | ESBI | ||
| 15 | 305/2004/3100 | BAPCO 66kV substation civil works with associate engineering & administrative authorisation | AREVA T&D | ESBI | ||
| 16 | 305/2004/3100 | 66kV cable works, civil works & installation at BAPCO | AREVA T&D | ESBI | ||
| 17 | 305/2004/3100 | 66 kV transmission development 95-97 | EDD | ESBI | ||
| 18 | 305/2004/3100 | ED-ALBA 66kV link | ALBA | ESBI | ||
| 19 | 305/2004/3100 | 66KV Cable Installation, Jointing & Testing - New Feeder Refinery - Newaidrat 1 &2 | ||||
| 20 | 305/2004/3100 | 66KV Cable Installation, Jointing & Testing - New Feeder Refinery - Newaidrat 3 | ||||
| 21 | 305/2004/3100 | 66KV Cable Installation, Jointing & Testing - Newaidrat - Sharq Sanad 1&2 | ||||
| 22 | 305/2004/3100 | 66KV Cable Installation, Jointing & Testing - Newaidrat - Sharq Sanad 3 | ||||
| 23 | 305/2004/3100 | 66KV Cable Installation, Jointing & Testing - Umm Al Hassam - Bughazal 1,2 & 3 Circuits | ||||
| 24 | 305/2004/3100 | 66KV Cable Installation, Jointing & Testing - Bughazal - Tubli 1,2 & 3 Circuits | ||||
| 25 | 305/2004/3100 | 66KV Cable Installation, Jointing & Testing - Sitra PS - Sitra Shamal Circuit | ||||
| 26 | 305/2004/3100 | 66KV Cable Installation, Jointing & Testing - New Feeder Buquwwah - Al Hajar Circuit 1, 2 & 3 | ||||
| 27 | 305/2004/3100 | 66KV Cable Installation, Jointing & Testing - Loop in of Jasra - Dumistan into MAQABAH | ||||
| INSTALLATION OF 220kV CABLES | ||||||
| 28 | 4666/2013/3100 | 220kV REINFORCEMENT DIVERSION CABLE WORKS LOT -1 | ||||
| 29 | 4666/2013/3100 | Installation of 220 kV Cable- Diyar Al Muharraq - Amwaj | EWA | LS Cables | Circuit length - 6.6kms | |
| 30 | 4666/2013/3100 | Installation of 220 kV Cable - NEW RIFFA - Isa Town North | EWA | LS Cables | Circuit length - 1.025kms | |
| 31 | 4666/2013/3100 | 220kV REINFORCEMENT DIVERSION CABLE WORKS LOT - 2 | ||||
| 32 | 4666/2013/3100 | Installation of 220 kV Cable - LILO Add Dur to New Riffa | EWA | LS Cables | Circuit length - 4.2 kms | |
| 33 | 4666/2013/3100 | Installation of 220 kV Cable - New Riffa to Shamal Al Ali | EWA | LS Cables | Circuit length - 4.2 kms | |
| 34 | 4666/2013/3100 | Installation of 220 kV Cable - Water front - New umm al hassam | EWA | LS Cables | Circuit length - 2.2kms | |
| 35 | 4666/2013/3100 | Installation of 220 kV Cable - New Umm Al Hassam - Manama | EWA | LS Cables | Circuit length - 2.2 kms | |
| 36 | 4666/2013/3100 | Installation of 220 kV Cable - Al Ezzel - New Hidd - Dyar Al Muharraq | EWA | LS Cables | Circuit length- 950M | |
| 37 | 4666/2013/3100 | Installation of 220 kV Cable - Al Ezzel - New hidd - Al Hadeed | EWA | LS Cables | Circuit length - 800M | |
| 38 | 4666/2013/3100 | Installation of 220 kV Cable - Al ezzel - New hidd- Marsa Al Bahrain | EWA | LS Cables | Circuit length - 960M | |
| 39 | 4666/2013/3100 | Installation of 220 kV Cable - Umm Al Hassam - Shamal Al Fateh - Hidd | EWA | LS Cables | Circuit length - 2kms | |
| 40 | 4666/2013/3100 | Installation of 220 kV Cable - Issa Town-Water Front | EWA | LS Cables | Circuit length - 7.5 kms | |
| 41 | 4666/2013/3100 | Installation of 220 kV Cable - Water Front - Umm Al Hassam | EWA | LS Cables | Circuit length - 4.9kms | |
| 42 | 4666/2013/3100 | Installation of 220 kV Cable - Embassy - New Hidd | EWA | LS Cables | Circuit length - 1.5 kms | |
| 43 | 305/2004/3100 | 220kV Transmission Development(2007-2011) EPC Project Al Sakhir Substation Project - Equipments, Panels, Civil works, Cable supply & MEP installation | EWA | ESBI | ||
| 44 | 305/2004/3100 | 220 kV Transmission Development(2000-2004), 2005-2009) & (2007-2011) –ALL THREE PHASES-Cable Feeders Civil Works & Installation | EWA | ESBI | ||
| 45 | 305/2004/3100 | 220 kV Bahrain Financial Harbour - Al Ezzel Circuit | EWA | ESBI | ||
| 46 | 305/2004/3100 | 220 kV Bahrain Financial Harbour - Embassy Circuit | EWA | ESBI | ||
| 47 | 305/2004/3100 | 220 kV Bahrain Financial Harbour - Waterfront Circuit | EWA | ESBI | ||
| 48 | 305/2004/3100 | 220 kV Buquwwah - Waterfront Circuit | EWA | ESBI | ||
| 49 | 305/2004/3100 | 220 kV Buquwwah - Isa Toawn North Circuit | EWA | ESBI | ||
| 50 | 305/2004/3100 | 220 kV Buquwwah - Jasra Circuit | EWA | ESBI | ||
| 51 | 305/2004/3100 | 220 kV No.2 Sitra -Riffa Circuit | EWA | ESBI | ||
| 52 | 305/2004/3100 | 220 kV Sitra Umm Al Hassam Circuit | EWA | ESBI | ||
| 53 | 305/2004/3100 | 220 kV Isa Town North- Waterfront Circuit | EWA | ESBI | ||
| 54 | 305/2004/3100 | Additional Works for Jasra _ Al Madinah Al Shamaiah | EWA | ESBI | ||
| 55 | 305/2004/3100 | Loop in of Isa Town North - Waterfront 220 kV Cable Circuit to Buquwwah Substation | EWA | ESBI | ||
| 56 | Replacement of 220 kV oil filled cable under Sitra bridge | ETD/EWA | ESBI | |||
| 57 | Installation of 220kV Cable feeders-phase 1 | MEW | ESBI | |||
| 58 | 4605/2006/3100 | replacment of Sitra Bridge Cables - Umm Al Hassma Circuit Nos 1 & 2 | EWA | ESBI | ||
| 220kV EWA PROJECTS | ||||||
| 59 | Replacement of 220 kV oil filled cable under old Sitra bridge | ETD/EWA | ESBI | |||
| 60 | 220 kV Transmission Development (2007-2011) –Cable Feeders Civil Works & Installation | EWA | ESBI | |||
| 61 | 220 kV Transmission Development(2000-2004), (2005-2009) –ALL PHASES-Cable Feeders Civil Works & Installation | EWA | ESBI | |||
| 62 | Installation of 220kV Cable feeders-phase 1 | MEW | ESBI | |||
| ELECTRIC DISTRIBUTION WORKS | ||||||
| 63 | Construction of 11kV intake substation building & switch room at Zallaq | EWA/ESBI | ESBI | |||
| 64 | Upgrading Power Installations at Riffa | BDF | ESBI | |||
| 65 | Electrical works for wharf & Al Daar Valve stations | BANCO | ESBI | |||
| 66 | Construction of 11kV substation, switch room and 5 generator rooms | Ritz Carlton Hotel | ESBI | |||
| 67 | Construction of substation with generator room & switch room Safriya, Sakhir & Zallaq | EWA/MEW Spl Projects | ESBI | |||
| 68 | Upgrading 11kV distribution at International Airport, including construction | Civil Aviation | ESBI | |||
| 69 | Power distribution Load balancing construction of substations and overhead | Public Security | ESBI | |||
| 70 | Upgrading 11kV distribution at BAH International Airport, including civil construction | Civil Aviation Directorate | Civil Aviation Directorate | |||
| 71 | Power distribution Load balancing construction of substations and overhead Lines | Public Security | Public Security | |||
| 72 | Security lighting, Power distribution, Construction of Substation & LV room at Safra | Public Security | Public Security | |||
| 73 | Electrical work of 11kV substation, switch room and 5 generator rooms | Ritz Carlton Hotel | Ritz Carlton Hotel | |||
| 74 | Electric work & installations in setting up of 11kV Substation with generator room & switch room at Safriya, Sakhir & Zallaq | EWA | EWA | |||
| 75 | Construction of Energy Centre Building for Government House, Gudabiya, including LV room, Generator Room-Civil Electrical & A/C | EWA/ HALLCROW | EWA/ HALLCROW | |||
| 76 | Electrical work of 11kV intake substation building & switch room at Zallaq | EWA/ESBI | EWA/ESBI | |||
| 77 | Electrical works for wharf & Al Daar Valve stations | BANCO | BANCO | |||
| 78 | Electrical installtion for Scada works for SADP project | BAPCO | BAPCO | |||
| 79 | Street lighting at Awali Residential & Office Complex | BAPCO | BAPCO | |||
| 80 | Upgrading Power Installations at Riffa | BDF | BDF | |||
| 81 | Modernisation of airfield lighting, Bahrain Intl. Airport | Civil Aviation | Civil Aviation | |||
| INSTALLATION, TESTING, CALIBRATION AND COMMISSIONING OF 11kV PANELS | ||||||
| 82 | BDF RUMAITH CAMP | EWA | ||||
| 83 | BDF SITRA CAMP | EWA | ||||
| 84 | BDF CAMP KHALIFA PORT, HIDD | EWA | ||||
| 85 | BDF CAPITAL CAMP, MINA SALMAN | EWA | ||||
| 86 | QASSER AL ROWDHA | EWA | ||||
| 87 | BDF SAKHIR AIR BASE | EWA | ||||
| 88 | SAKHIR PALACE PRESIDENTIAL VILLAS INTAKE | EWA | ||||
| 89 | BDF CAMP WADI ALI | EWA | ||||
| 90 | BDF CLINIC WADI ALI SAIL | EWA | ||||
| 91 | SALMANIA MEDICA; CENTRE | EWA | ||||
| 92 | BDF BRITISH CAMP, MINA SALMAN | EWA | ||||
| 93 | ISA AIR BASE, OLD PRIMARY | EWA | ||||
| 94 | CARDIAC CENTRE AWALI | EWA | ||||
| 95 | UMM AN NASSAN ISLAND NEW INTAKE | EWA | ||||
| 96 | MNR SH FAIZAL COMPLEX | EWA | ||||
| 97 | SAFRA POLICE INTAKE | EWA | ||||
| 98 | REGENCY HOTEL NEW INTAKE PANELS | EWA | ||||
| 99 | 1 AND ONLY HOTEL COMPLEX, SEEF | EWA | ||||
| 100 | ASRY, NEW VCB PANEL | EWA | ||||
| 101 | BAHRAIN FINANCIAL HARBOUR, NEW 11kv PANELS | EWA | ||||
| 102 | ISA AIR BASE, NEW INTAKE (WITH NEW PRIMARY) | EWA | ||||
| ELECTRICAL TRANSMISSION WORKS | ||||||
| 103 | Security lighting, Power distribution, Construction of Substation & switch room at Safra | Public Security | ||||
| 104 | Electrical installation for Scada works for SADP project | BAPCO | ||||
| 105 | Modernisation of airfield lighting, Bahrain Intl. Airport | Civil Aviation | ||||
| 106 | Street lighting at Awali Residential & Office Complex | BAPCO | ||||
| 107 | Construction of Energy Centre Building for Government House, Gudabiya, including LV room, Generator Room | EWA/ HALLCROW | ||||
| 108 | Replacement & modernisation of Airfield Lighting | Civil Aviation | SIEMENS | |||
| 109 | Project AF 15, including Construction of substations | BDF | ||||
| 110 | Satelite Station at Jabel Dukan, including sub stations & Generator Room | BDF | ||||
| 111 | Upgrading Power Installations at Riffa, including construction of substations & switch room | BDF | ||||
| 112 | Reinforcement work at Sitra Power Station | Ministry of Works, Power & Water | ESBI | |||
| WATER TRANSMISSION PIPELINE PROJECTS | ||||||
| 113 | 003/200/3100 - PM Package1 [2003-2004] | Water Transmission Project Associated with Coke calcining & Desalination Plant 800/600 DN Di Pipeline from Alba FS to Sitra DS | EWA | Hyder Consulting Middle East LTD | 880 DN - 5.7 kms 600DN-2.95 kms | |
| 114 | 0387/2004/3100 2006-2007 | Water Transmission Pipelines in the Northern Region [ Janusan to Budayia DS and Branch to SAR DS - p5] | EWA | Black & Veatch International Ltd | 880 DN - 5.24 kms 600DN-23.48 kms | |
| 115 | 4624/2011/3100 2013-2014 | North Manama Causeway EWA Pipeline Diversion along Al Fateh Highway and King Faisal Highway - Phase 2 | EWA | Hyder Consulting Middle East LTD | 1000 DN - 1.373 kms 800DN-0.60 kms | |
| 116 | 4616A/2011/3100 [2015-2017] | Pipe Line West Installation Works (PIW 4616 A) - West Riffa BS to HTFO, HTFO to Hamla 'A'and Salmabad FS to Hawart Al Ali DS | EWA | Mott MacDonald Ltd | 1200 DN - 2.58 kms 1000 DN - 1.69 kms 800DN - 0.960 km 600DN- 4.218 kms | |
| 117 | 4622/2015/3100 [2016 - 2017] | Sh.Jaber Al Ahmed Al Subah Highway upgrade Alba & Nuwaidrat Interchanges - Water Transmission Diversion Works | EWA | Mott MacDonald Ltd | 1000 DN - 0.100 kms 800DN - 1.05 km 600DN- 1.358 kms | |
| 118 | Replacement of 600 DN from West Riffa to Isa Town West and Isa Toawn East | EWA | WTD | 600DN- 1.358 kms | ||
| 119 | 4624/2011/3100 2013-2014 | Laying pipelines at Al Areen. 600Ø & 800Ø DI pipes | EWA | Hyder Consulting Middle East LTD | ||
| 120 | 4624/2011/3100 2013-2014 | North Manama Causeway diversion pipeline 800-1000Ø DI pipes | EWA | Hyder Consulting Middle East LTD | ||
| 121 | 4624/2011/3100 2013-2014 | Laying 1200Ø DI pip at Tubli, Part of Phase III | EWA | Hyder Consulting Middle East LTD | ||
| 122 | Laying 200mm dia DI water pipeline from Al Jazer Beach, Al Areen Rd to Al Muttalah Area | EWA | ||||
| 123 | Laying mains to Royal Court properties 400mm dia DI pipes | EWA | ||||
| 124 | Hafeera BDF Extension of mains for BDF – 200mm dia DI pipes | EWA | ||||
| 125 | Transferring Hawar Line to South Alba new tower & re-zoning refinery R/A tower to Shk Airbase- 600mm dia DI pipes | EWA | ||||
| 126 | LAHSSAY-SOUTH ALBA-laying of 200Ø waterMains & Service Pipes | EWA | ||||
| 127 | Laying ofWater Main Phase II Part of North Extension, SOUTH ALBA | EWA | ||||
| 128 | SAFREH, Blk944- Supply to Ministry of Interior for new developments | EWA | ||||
| 129 | AL QURAYAN - Extnesion of Mains for Hydrophonic Farm | EWA | ||||
| 130 | DI Water Mains of 300/400mm dia for Bahrain International Circuit (Formula 1), Sakhir | EWA | ||||
| 131 | Laying 200mm dia DI water pipeline at Rumaitha | MOHME | ||||
| CIVIL WORKS | ||||||
| 132 | Albaskan Phase 13 | ALBA | ||||
| 133 | Project AF-15 including construction of substations & Project Smart Phase II (Equipment & Antenna Foundations.) | BDF | ||||
| 134 | Construction of Generator rooms, sub stations including supply & installation of 11kV switchgear & generators at SITRA BDF Camp & also underground RCC water tank | BDF | ||||
| 135 | Construction of Generator rooms, sub stations including supply & installation of 11kV switchgear & generators at Hamla BDF Camp | BDF | ||||
| 136 | Construction of Generator rooms, sub stations including supply & installation of 11kV switchgear & generators at HIDD BDF Camp & also underground RCC water tank | BDF | ||||
| 137 | Construction of Generator rooms, sub stations including supply & installation of 11kV switchgear & generators at Rumaitha BDF Camp | BDF | ||||
| 138 | Construction of Offices, separating walls at Sitra | CSD | ||||
| 139 | Construction of 66kV Substation at Sakhir, including electrical & mechanical installations & commissioning | EWA/ESBI | ||||
| 140 | Construction of 66kV Substation, LSDPP, Refinery, including electrical & mechanical installations & commissioning | EWA/ESBI | ||||
| 141 | Construction of 11kv intake substation building & switch room at Zallaq | EWA/ESBI | ||||
| 142 | Rehabilitation & Development of Al Andulus Garden | MMAA | ||||
| 143 | Construction of Recreation centre, including cenema, bowling at Jiddah Island | MOH | ||||
| 144 | Construction of Palm Groove Plaza at Jiddah Island | MOHME | ||||
| 145 | Construction of Meuseum at Jiddah Island | MOHME | ||||
| 146 | Construction of 75 Villas, including providing fixtures & amenities at SAR | Private | ||||
| 147 | Construction of 4 barrack blocks at Wasmiya for PM | Public Security | ||||
| 148 | Construction of 3 barrack blocks at Safra | Public Security | ||||
| 149 | Construction of Supermarket, including mechanical & electrical installations at Safra | Public Security | ||||
| 150 | Construction of women prison at Juvenile Care Centre Isa Town | Public Security | ||||
| 151 | Construction of Generator rooms, sub stations including supply & installation of 11kV switchgear & generators. | Ritz carlton Hotel | ||||
| 152 | Extension of Warehouse & Recreation Centre to Trader Vic Restaurant | Ritz carlton Hotel | ||||
| POWER EQUIPMENT TESTING & POWER QUALITY ANALYSIS | ||||||
| HV & LV CABLE TEST | ||||||
| 153 | Insulation Resistance test -250/500/1000/2500/5000/10000 V DC | |||||
| 154 | Polarization Index Measurement | |||||
| 155 | Step Voltage Insulation Resistance Test | |||||
| 156 | Dielectric Discharge Measurement | |||||
| 157 | Hi-Pot test - up to 25kV DC | |||||
| 158 | VLF test - up to 20 kV | |||||
| 159 | Underground HV & LV cable tracing & identification | |||||
| HV switch gear panel testing & commissioning | ||||||
| 160 | Bus bar insulation resistance test | |||||
| 161 | Hi - Pot test | |||||
| 162 | Low resistence measurement for bus bars | |||||
| 163 | current transformer ratio & polarity test | |||||
| 164 | Current transformer knee point voltage measurement | |||||
| 165 | Voltage transformer ratio & polarity test | |||||
| 166 | Breaker analysis - operation timing/contact resistance | |||||
| 167 | Primary injection test for Protection relays | |||||
| 168 | Substation Earthing measurement | |||||
| Transformers testing | ||||||
| 169 | Insulation resistance measurement | |||||
| 170 | Winding Resistance measurement | |||||
| 171 | Oil BDV test | |||||
| 172 | Magnetic balance test | |||||
| 173 | Ratio test on taps & polarity test | |||||
| 174 | Vector group confirmation | |||||
| Power system study, PQA | ||||||
| 175 | Online analysis & measurement of harmonic in the network | |||||
| 176 | Power factor improvement study recommendations | |||||